Jump to content

All Activity

This stream auto-updates

  1. Today
  2. In the 3D scene you can define each table by modules. In the Orientations management you find detailed information about what is defined for each orientation In the following youtube tutorial you find examples of how to define a 3D scene and how to navigate in the window: On our website you can do a request for a training sessions on various topics: https://www.pvsyst.com/en/training/consulting/
  3. Also, I am noticing the following limitation of the software: in the 3D scene there is a way to specify the width and the length of a PV surface while in the system definition there is only an option to specify the area of a PV surface making the whole process of matching the number of PV modules between the 3D scene and the system definition cumbersome at best... unless I am missing something
  4. Dear @PranavK, this is new to us and unfortunately I cannot say much without looking at the project. Can you send it over at support@pvsyst.com ?
  5. Thank you for your response, but the reason why I posted to this forum is because I could not correct the errors myself. Is there a way to request a call via MS Teams so I can share my computer screen and someone from PVsyst support will provide the assistance?
  6. Hi @Michele Oliosi, I am experiencing a similar issue currently. I've run two iterations of the same project in two different versions 8.0.14 and 8.0.19. All the parameters are the same. The Shadings: Electrical Loss acc. to strings in the latest version jumps to 15.1% compared to 4.1% from the previous version. Also, the Inverter loss over Nom. inverter power loss was 4.5% previously which later decreased to 0.5%. The loss diagrams from both versions are attached. Could you please help with this?
  7. First of all, the definition of the "Solar Fraction" SF = EUser / ELoad is valid for Grid-connected systems. In Stand alone systems this is more complex: it is the Output of the PV system (EOut converter), minus the battery energy balance: SF = ( EOutConverter - EBattCharge + EBattDischarge ) / ELoad. The battery balance (EBattCharge - EBattDisch) includes the difference in SOC between the beginning and the end of the interval, and the battery losses. Therefore: - Over la short period, the Solar fraction is not relevant because of the battery SOC difference, - Over a long period, the SOC difference contribution becomes lower, but may still alterate the real value of the Solar Fraction. Now the battery losses are extremely difficult to evaluate, especially due to the variability of the effective capacity of the battery according to the Charge/Discharge rate: in PVsyst this is an approximation, which may sometimes lead to "positive" battery losses in some cases (depending on your load profile definition). This seems to be the case in your project, where the differences are very low (some few permille). See the Help https://www.pvsyst.com/help/physical-models-used/batteries/battery-model/battery-efficiency.html?h=battery
  8. You can find the detailed explanation to your question in our documentation on the power factor : https://www.pvsyst.com/help/project-design/grid-connected-system-definition/power-factor/index.html Check in particular: https://www.pvsyst.com/help/project-design/grid-connected-system-definition/power-factor/Simulation results.html In short: the power factor that you set in the menu "Energy management", here cos(phi)=0.9, is the power factor at the inverter level. The reactive power will be computed from the available power at the output of the inverter as EReGrid=EOutInv×tan(ϕ). We assume that there is no loss of reactive energy from the inverter to the injection point. However, we assume active energy loss in the AC circuit. Therefore, the power factor at the injection point will be decreased compared to the setting at the inverter output.
  9. Hello, The error message indicated that the 3D scene and the system definition does not match. For instance, in the first orientation (tilt 5° and Azimuth 180°), 1564 modules are defined in the system but only 1427 in the 3D scene. Verify also that the orientations, are correctly defined. In PVsyst, Azimuth of 0° is towards the equator, and 180° thus the opposite orientation (North is the northern hemisphere and South is the southern hemisphere)
  10. Yesterday
  11. I am designing a hybrid (roof + carport) PV system and getting several error messages referenced in the attachments. Could you help me to correct the errors?
  12. Dear Gavin, Thanks for the detailed analysis. These are valid points and we agree that the current LCOE formulation in PVsyst does not strictly match the standard, financing-neutral definition commonly used in the literature. We also confirm that the discount rate used in PVsyst is the nominal one. We’ll take a closer look at this internally, both to better clarify what the current indicator represents and to evaluate how we could move closer to commonly accepted LCOE formulations (project-level, WACC-based) in the future. Appreciate you taking the time to raise this and share your perspective. Best regards.
  13. Please send your project to support@pvsyst.com and we can have a closer look. Kind regards
  14. Last week
  15. Yes, First Year is selected in the ageing tab, The latest version of PVSYST i'm using. 8.0.19
  16. Auxiliaries tab: proportional to inverter output power (i.e., 1 W/kW = 0.1%, etc.).
  17. Indeed, the unlimited sheds only consider the row to row shadings. For a more detailed analysis of the shadings from objects such as trees and buildings, you can define a 3D scene and simulate the electrical shadings with the module layout. The following youtube tutorial illustrates haw to create a 3D scene, and the following link to our help page, describe how to define the module layout: https://www.pvsyst.com/help/project-design/shadings/electrical-shadings-module-layout/index.html
  18. hello, In the print screen you have activated the "multi MPPT feature" and defined 3 MPPTs, though your inverter has 2MPPTs per inverter, this 1.5 inverters with a total of 15kWAC for a nominal PV Power of 13.9kWp. The following youtube tutorial shows in detail how to define your system configuration (in version 7):
  19. hello Jack, thanks for your message. What you reported is not a bug and has been done by design. This window has been limited in size, otherwise it would display big empty spaces without any additional information. regards, Laurent
  20. Optimizers won't necessarily increase the system production. Optimizers are especially useful when a part of the string is partially shaded, and has a different Impp (current at max power point) from the rest. Without optimizers, the whole string have to use the current of the worst module, leading to a lower overall production. With optimizers, the shaded and unshaded modules can operate at their own optimum current, the optimizers ensuring the output current to be the same. But when you don't have partial shadings, optimizers cannot improve anything. And since optimizers have their own efficiency, they end up increasing the system losses, leading to a lower PR.
  21. Hello, In the second print-screen, you must activate the option "Use the sharing of Nominal Power between MPPT inputs of a same inverter". You find a full tutorial of how to use this tool (version 7) in the following youtube video: Kind regards
  22. Hello, Thank you for reaching out. Please first verify that you are indeed simulating the first year (that in the aging tab in the detailed losses window, year 1 is defined). What PVsyst version are you using ? Some discrepancies and rounding errors can appear Kind regards,
  23. "I want to know whether such calculation results are normal and what the reasons for such differences are?
  24. I have a question regarding the power factor. I set the power factor(cos phi) to 0.9 in PVsyst Version 7.4, but the energy flow diagram in the calculation result report shows it as 0.894. I would like to know the reason for this discrepancy.
  25. Earlier
  26. one thing more to clear that in real in my house a 13.340KW system installed with 15KW inverter, and also 23 Panels installed of 580W capacity/panel install, then why I can't modeled in PVsyst exact 23 panels but in reality I installed, in real I install a 15kw inverter but in pvsyst i use 10kw but pvsyst telling that inverter is oversized so what is this plz clarify thanks
  27. There is a existing project that I need to make a simulation using pvsyst. The inverter is sma sunytripower 110. i understand that I need to make subarrays to make simulate different no of strings in 2 different inverters. but in power sharing tab, there is plus sign to add a different configuration is not green and inactive. How to I fix it? Or am I doing it wrong?
  1. Load more activity
×
×
  • Create New...