Everything posted by André Mermoud
-
Yes there was also a big problem (freezing) when you defined SolarEdge inverters along with not-SolarEdge ones in other sub-arrays. There was not a straightforward solution. This has been treated in the version 6.69 by a serious update of the SolarEdge Management.
-
Meteo data are subject to some "rules". For example, we have a model for the clear sky conditions, with an accuracy of 2-3% towards high values. The meteo data cannot be too high with respect to this model. If so, they are doubtful, you should choose another meteo data source.
-
I don't know what happens. Please send your full project (using "Files > Export project" in the main menu) to support@pvsyst.com.
-
"Electrical behaviour of PV arrays" graphic toll bug
André Mermoud replied to atgosat's topic in Problems / Bugs
On this graph, the resulting I/V curve (String#2, 2 unshaded sub-modules) is not drawn. This is indeed a bug. Except this problem, the graph seems correct. -
PVSYST V6.71 Normalized production graph abnormality
André Mermoud replied to JasielSantana's topic in Problems / Bugs
Yes, this is a problem of scale: the values are correct, but the drawing bars are not based on 0. This is corrected in the new version 6.73. -
Yes there is indeed an accidental error in this version 6.73. This will be repaired in the next version. In the meawhile, you should define these values with the version 6.72 (you can always download an old version, and use it in parallel of your usual working installation). In this is already defined and you don't open this dialog (page "wiring losses"), the parameters will stay correct for the simulation.
-
The array temperature is calculated from the GlobInc (irradiance on the PV plane. Therefore it is quite normal that it is different with different orientations.
-
This is a generic error. We cannot say anything with just this information. When occuring, you are asked for sending us a bug report. This helps us a lot. Otherwise, please send us the screenshot of your error message (full screen), with a complete description of your problem (what you are doing, etc). Send it to support@pvsyst.com.
-
Power generation data of Probability (P90,P70 etc)
André Mermoud replied to Lunatic09's topic in How-to
Applying the probabilistic evaluation P90 to hourly, daily of even monthly values doesn't make sense. P90 is an annual evaluation. Please see our FAQ "What is the P50-P90 probability production ?". PVsyst only allows mixing the orientation #1 and #2 on a same inverter input. This is a limitation. Now you can define several sub-arrays, with different MPPT inputs, for different orientations. The sub-array - i.e. inverter MPPT input - may only be defined in an homogeneous way (same module, same number of modules in series). -
The Minimum voltage for getting Pnom is equivalent to an input current limitation. By defining VminPNom, the minimum voltage for attaining PNom, we have: - Imax = Pnom (DC) / VminPNom, - where Pnom(DC) = PnomAC / Efficiency. If this value is specified in the inverter, it is obviously taken into account in the simulation. Everything is explained in detail in the contextual Help "Physical models used > Grid inverter > Inverter Operating Limits" and other topics.
-
The relevant parameter is "Limit overload loss for design" in the Prject's definition (button "Project's Settings"). See the FAQ Can I define a system with highly undersized inverter ?
-
Since V 6.68, there is a new loss named "Global incident below threshold" in the loss diagram. For simulation hours when the GlobInc value is below a given threshold, PVsyst doesn't perform the full simulation: this is considered as a "not significant" hour. This threshold is fixed at 10 W/m2. Remember that by very covered weather conditions, you have still 40 to 50 W/m2 ! Up to now this (little) loss was included in the Near Shading or IAM loss contribution. For balance coherency, this is now accounted independently. This contribution rarely overcomes 0.05% in yearly values.
-
The procedure is fully described in the help "Project design > Bifacial Systems", and "Project design > Bifacial Systems > Bifacial system: 2-dimensional unlimited sheds/trackers".
-
No, you cannot do that.
-
Power generation data of Probability (P90,P70 etc)
André Mermoud replied to Lunatic09's topic in How-to
The P50 - P90 concept is explained in the help "Project design > P50 - P90 evaluations" It is a probabilistic interpretation of your simulation result. It is only applicable to an annual result. You can connect at most 2 orientations on an inverter input. Please define these 2 orientartions, and you can choose (Mixed orientations 1 + 2) in the sub-array. NB: All module of each string should be in the same orientation. You cannot mix orientations within a string. -
This is explained in the help "Component Database > Pump definition". However this is a complex topic: if you have detailed datasheets, you can ask me for including them in the database.
-
No sorry, the PDF provided by PVsyst are now closed for avoiding manipulations of results.
-
This depends on how you define a Micro or a String inverter. To my opinion, a micro inverter is suited for one module, i.e. with a Pnom of less than, say, 300 W. In the present time, by "String inverter", people usually talk of inverters suited for 2-4 strings, i.e. some few kW. More than 15 years ago, some inverter manufacturers called "String inverters" devices for which all the safety components (usually present in the roof junction box) are included in the inverter. This is the definition of PVsyst.
-
By definition, the "Array virtual energy at MPP" is the value at MPP. It is obviously not modified by this condition. This loss will be accounted in the inverter losses "under the voltage threshold".
-
The “Ground reflection on front side” is a by-product of the Bi-facial model. It is not possible to calculate it with "normal" systems, without several additional parameters and a calculation model that we don't have at disposal at the moment (the bi-facial model is specific for unlimited sheds). By the way its value is very low for usual tilts. To my knowing, this quantity is never calculated (nor taken into account) by any other PV system simulation tool.
-
PVsyst will report Errors (in red) which prevent the simulation, and "Warnings" (in orange) which indicate a not optimal choice, but allow the simulation. Now when PVsyst reports an error (for example in a component), it is not able to get results, or the results may be erroneous.
-
Please see our FAQ How to adapt PVsyst to floating systems ?
-
Bi-facial Modules - View Factor for Rear Side
André Mermoud replied to Rafael Santos's topic in Simulations
Perhaps it will useful to read the help "Project design > Bifacial Systems". Everything is explaned in detail here. Namely the View factor gain (geometric calculation) should be thought as an Energy transfer. When passing to irradiances, it should be renormalized with 1/GCR. -
Shading simulation using Dual cells module(144 cells)
André Mermoud replied to Luciano Nadai's topic in PV Components
This is not yet implemented. Please see the FAQ How are managed the new "twin-modules" with half cells. -
For the sizing of cables in the DC part (PV sub-array), you have a tool in "Detailed losses > Ohmin losses > detailed computations". In this tool, you can open "Wires" for the main properties of each cable section. Please also see the help "Project design > Array and system losses > Array ohmic wiring loss".