Jump to content

Recommended Posts

Posted

Hello,

I have noticed a behavior when simulating a PV plant with an active power injection limit at POI. In the output CSV file, the power seems to start being limited slightly before reaching the configured threshold in the simulation settings.

I am attaching a screenshot of both the CSV output and the configuration parameters for reference.

image.png.8e0931af4e736b9c0062526f848ab185.png

image.thumb.png.1e4c6d3c70f7a80c2ed2c11eb3ae4e24.png

Could you please clarify why this limitation is applied earlier than the set value? Is this an intended behavior in the model or is there a specific setting that I should adjust?

Thank you for your support.

Best regards,

Posted

Hello,

Indeed, this is not the expected behavior. Since the grid limitation is applied at the Pnom, we have observed that in certain situations—when the MPPTs operate under very different conditions—this may lead to results that do not perform as intended.

To analyze your project in more detail, could you please export it as a .zip file and send it to our support team at support@pvsyst.com? We apologize for the inconvenience.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...