Andel Posted March 28, 2023 Share Posted March 28, 2023 (edited) Hi, We have large-scale solar PV system and the total area of the PV power plant of 95 (hectare). Now we want to make preliminary design for this project just to estimate the the capacity MWp this fits to this area and also we want to estimate the energy yield MWh/year. I started with preliminary design option in PVsyst, but I don't know how can I translate 95 ha to one of these "Array specification" options. As I understood the "active area" option refers to the area of the PV modules not the area of the PV power plant. Please can you give me an idea how can I estimate 95 ha here in the preliminary design? Edited March 28, 2023 by Andel Link to comment Share on other sites More sharing options...
Lazare Fesnien Posted March 29, 2023 Share Posted March 29, 2023 Dear Andel, Usually we can estimate that 1 ha corresponds to 1 MWp of PV module. Link to comment Share on other sites More sharing options...
Andel Posted March 29, 2023 Author Share Posted March 29, 2023 Thank you for your answer In the preliminary design in PVsyst " Grid system pre-sizing , is there any possibility to estimate the capacity and yield of the project by using GCR? Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now