Jump to content

Odd Numbered Strings in SolarEdge Architecture


jack.keane

Recommended Posts

For even number strings, it's easy enough: Nb. of modules in parallel = 2; Nb. optimizers in series = String length/2

For odd number strings, what would be the best way to model them in PVsyst? (2 modules per optimizer, with the last optimizer having 1 module)

I can't add a subarray with Nb. of modules in parallel = 1, and then add the missing modules, as there must be 14 optimizers in series.

 

More about the system:

Modules - Hanwha Q.PEAK DUO L-G6.2 430

Optimizers - SolarEdge P860

Inverters - SE33.3K-US

 

Any tips or tricks that have worked for people in the past?

example.png

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...