Hello everyone,
I'm new to PVSyst. I'm working on a 2.4MWp ground-mounted power plant project. I'd like to run a PVSyst simulation, but first I'd like your advice on the method to use.
I have the following configuration 4012 modules (605Wp) and 6 inverters 330KTL (6 MPPT).
I opt for the following configuration 5 inverters with 4 strings / MPPT 28 modules in series and one inverter with 4 strings of 28 modules on one MPTT and 4 strings and 27 modules on the other 5 MPPT.
What is the best solution for simulating this configuration in PVSyst?
Do I have to use Share power? If not, what other solution is there?
Thanks for your answers ,