Jump to content

Pvfrance

Members
  • Posts

    2
  • Joined

  • Last visited

  1. Hello everyone, I'm new to PVSyst. I'm working on a 2.4MWp ground-mounted power plant project. I'd like to run a PVSyst simulation, but first I'd like your advice on the method to use. I have the following configuration 4012 modules (605Wp) and 6 inverters 330KTL (6 MPPT). I opt for the following configuration 5 inverters with 4 strings / MPPT 28 modules in series and one inverter with 4 strings of 28 modules on one MPTT and 4 strings and 27 modules on the other 5 MPPT. What is the best solution for simulating this configuration in PVSyst? Do I have to use Share power? If not, what other solution is there? Thanks for your answers ,
  2. Pvfrance

    String sizing

    Dear all, I'm a beginner in pvSyst and I'm trying to find out how I can put a certain number of previously calculated modules on an inverter. I already know the configuration and distribution of strings and modules on each MPPT. Should I use the subarrays and Power Swing functionality? If so, what are the best practices for waiting for a specific number of modules? Thank you
×
×
  • Create New...