Everything posted by furkann71

  1. How can I calculate inverter clipping losses with pvsyt? In my calculations the losses are lower than they are. Where am I making mistakes? Could you help?
  2. Hello, I do a panel layout on the terrain I imported with csv and then I use the automatic altitude feature, but some panels still seem to be embedded in the terrain. how can i solve this
  3. I get a warning that you should not use the module layout section because it is larger than 1 mw. What should I do?
  4. I import my land with csv and then place it in the zone I created, then I use the automatic altitude feature, but still some pv tables seem to be embedded in the land, how can I solve this problem?
  5. When I create a zone and place automatic pv tables on the land that I transferred with csv from outside, some pv tables do not settle, gaps occur, what could be the reason?
  6. How can I import weather data from outside sources?
  7. Which of the use in simulation options should I choose? 1-no shadings 2-linear shadings 3- 4- ??
  8. If I run the simulation after making a settlement according to the topology of my land in the close shadings tab for my project, will the production estimation result be based on these shading factors, that is, will it give results by evaluating the topology factors?
  9. Hi, When the 3D Shadow Scene screen opens, you will see several tools loaded in the upper right corner of the program. By clicking on the "Shadow Properties" button, you can set the intensity, color, visibility, etc. of the shadows. You can open a menu to set its variables. where is this i couldn't find it??
  10. Also, after importing the topography with csv, can I import the land image, how can I do it to pvsyst?
  11. Do I make a correct assessment by transferring the topography of the land to pvsyst with csv and then positioning and simulating it in pvsyt? Or are there any other steps I need to take to make an accurate production estimate?
  12. Do I make a correct assessment by transferring the topography of the land to pvsyst with csv and then positioning and simulating it in pvsyt? Or are there any other steps I need to take to make an accurate production estimate?
  13. hello, after transferring the topography of the land to pvsyst with csv, how do I place the panel on the land?
  14. 1-I want to place a panel in the middle of an area surrounded by mountains, for this I took the ground topology from sketchcup and transferred it to pvsyst, but when I right click, the convert to ground object option does not appear for me. How Can I Solve This? 2-I want to make a panel layout in the middle of the mountains I mentioned above and simulate the closest production to reality, can I import or provide the ground topology from the sketchcup? "How to import a place topography from GoogleEarth?" Will I have to do the steps you describe at the same time?
  15. 'How to import a ground topography from GoogleEarth?' -I did these operations, but in pvsyst, the terrain turns out to be 180 degrees, what is the reason for this, how can I solve it?
  16. 1-I want to place a panel in the middle of an area surrounded by mountains, for this I took the ground topology from sketchcup and transferred it to pvsyst, but when I right click, the convert to ground object option does not appear for me. How Can I Solve This? 2-I want to make a panel layout in the middle of the mountains I mentioned above and simulate the closest production to reality, can I import or provide the ground topology from the sketchcup? "How to import a place topography from GoogleEarth?" Will I have to do the steps you describe at the same time?
  17. Hi, 'To adjust the tracker tilt to the terrain, you will need to create a zone of trackers within PVsyst, and draw the zone over the terrain. ' can you tell me how to do this
×
×