I am simulating a plant with a nominal capacity of 240MW. However, the power injected into the grid must be limited to 210MW. By doing this, using the 'Grid power limitation' resource, I noticed that the energy produced by the system obtained a significant increase. Does it make sense to limit the injected power and obtain an increase in energy production? If yes, what is the possible explanation?