avalero Posted 3 hours ago Posted 3 hours ago Is there a feature to simulate plant ramp-up. For example. 0-100% in 15 minutes? This is due to grid code limitations. Thanks.
Michele Oliosi Posted 1 hour ago Posted 1 hour ago Hi, this feature is in our roadmap, but not before a few patches after the release of 8.1.0 With our internal beta of 8.1.0 we could already mimic this by running a simulation, then using that to determine a grid limitation time series that truncates the inverter power with ramps, and then resimulating with this new grid limitation time series. In version 8.0 the workaround is a bit more convoluted. You could mimic this with a self-consumption profile that acts as a stand-in for the losses in ramp-up (you would also need to simulate, then post process, create the load profile, then simulate again), but that is less practical as a workaround.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now