Deemas707 Posted February 15, 2023 Posted February 15, 2023 Hello I usually use batch simulation to compare different PV-plant configurations. And after performing batch simulation I usually had "E_grid" in kWh (in Project_BatchResults.csv file), but after last PVsyst update I started getting "E_grid" results in GWh. How can I change back from GWh to kWh?
Michele Oliosi Posted March 30, 2023 Posted March 30, 2023 This should be fixed in the upcoming update !