Energy Storage for Peak Shaving -- issues


CleantechPro

Recommended Posts

Hi, I ran a few simulations for a stand-alone ground-mount solar system with about 6 MW_dc solar/PV DC rating (without any energy storage) with success.

Later on, I added a properly sized energy-storage unit (BESS) to capture the excess generation during peak generation instances, and discharge those excess generation (which would otherwise be lost w/o BESS) into the grid during off-peak hours.

While the simulation ran with success, EBatDis in the PVsyst report has remained nearly 0 for all months (i.e. the BESS hasn't really been utilized at all).
I understand that PVsyst's storage facilities/capabilities are rather limited that but this simple case should have worked with PVsyst.

Any help would be appreciated. Thanks.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...