Jump to content

e grid in 10 min steps


BYES_DEV

Recommended Posts

  • 2 weeks later...
  • 10 months later...
On 9/26/2022 at 8:50 AM, André Mermoud said:

Basically, in the present time, PVsyst works in hourly steps. Therefore this is not possible.

By the way, providing 10 min output data would require to avail of 10-minutes meteo data  (irradiance and temperature). 

Hi, André!

Will PVSyst implement this possibility of 10-minute outputs in the near future? For an appropriate evaluation of hybrid/associated wind-photovoltaic projects, it is fundamental to have the maximum granularity possible in data to mitigate the errors of complementary between technologies. We already measure and store climatic data in 10-minute steps, so it would be of great to have PVsyst providing outputs of power in the same intervals. 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...