BYES_DEV Posted September 15, 2022 Posted September 15, 2022 Hello, is it possible to set the output file format to have the "e_grid" values in 10 minutes version instead of 1 hour (please) ? Thank you
dtarin Posted September 15, 2022 Posted September 15, 2022 The software can only output hourly values.
André Mermoud Posted September 26, 2022 Posted September 26, 2022 Basically, in the present time, PVsyst works in hourly steps. Therefore this is not possible. By the way, providing 10 min output data would require to avail of 10-minutes meteo data (irradiance and temperature).
Pozzatti Posted August 11, 2023 Posted August 11, 2023 On 9/26/2022 at 8:50 AM, André Mermoud said: Basically, in the present time, PVsyst works in hourly steps. Therefore this is not possible. By the way, providing 10 min output data would require to avail of 10-minutes meteo data (irradiance and temperature). Hi, André! Will PVSyst implement this possibility of 10-minute outputs in the near future? For an appropriate evaluation of hybrid/associated wind-photovoltaic projects, it is fundamental to have the maximum granularity possible in data to mitigate the errors of complementary between technologies. We already measure and store climatic data in 10-minute steps, so it would be of great to have PVsyst providing outputs of power in the same intervals.
André Mermoud Posted August 12, 2023 Posted August 12, 2023 This is on our roadmap. But it involves a very deep change in PVsyst, we will not find possibilities to develop this before probably more than one year.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now