Jump to content

PV Performance


sergio

Recommended Posts

I have to simulate the following performances:

(i) Produce a power output of at least ninety-seven-point eight percent (97.8%) of the

minimum power output specified in the applicable module data sheet during the first

six (6) months following the Warranty Start Date considered as the average of the

measures

(ii) Produce a power output of at least ninety-seven-point five percent (97.5%) of the

minimum power output specified in the applicable module data sheet during the

twelve (12) months following the Warranty Start Date.

(iii) have a yearly maximum decrease (or degradation) of power of not more than zero

point five percent (0.5%) from start of the second (2nd) twelve (12)-month period

following the Warranty Start Date until the end of such twelve (12)-month period, and

repeated for each successive twelve (12)-month period until the twenty-fifth (25th) anniversary of the Warranty Start Date.

Is PVsyst be able to perform what listed above? And in case, which are the related graphs?

Thanks in advance

Sergio

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...