Jump to content

vigneshsekaran

Members
  • Posts

    3
  • Joined

  • Last visited

Everything posted by vigneshsekaran

  1. Hello, As we all know that the lifetime period of Solar PV Power plant is about 20 - 25 years if we properly coordinate the Operations and Maintenance protocols. We are provided with the generation data of Solar PV power plant for the 1st year with the losses diagram after we have done a simulation analysis in PVsyst. Is there any way to obtain the overall lifetime period generation of solar PV power plant with the losses diagram? Like every year we need to be provided and it has to be shown in the report as well. Also, I would suggest adding the "O&M factor" in the Detailed losses tab in the workspace. It would be great to have the standardized technical information in the background of the O&M tab to assign the value throughout the entire life period. Looking forward! Thank you
  2. Hello, Whenever I am creating the new site (.MET) file will be available in the location C:\Program Files (x86)\PVsyst6.7.5\DataRO\PVsyst660_Data\Meteo but I have imported the NASA data for one of the sites and I saved (.SIT) file as well extract as (.MET) file. But the relevant file is not available in the location. I need to get (.MET) file for sharing with others. Please help me in this regard. Thank you
×
×
  • Create New...