Greetings, I'm doing a project and I've found out a bug on the PR calculations. In the PVsyst Report attached the PR average for the first year is 80,9%PVSyst_Report_Fortissue 2,73 MWp (JA 540W).zip, when in fact the calculations are wrong the correct value must be 83,5%. I've downloaded the User Hourly and checked the values in a excel PR Bug excel file.zip, all figures are correct, only that PR percentage. This is the first time that this has happened on the hundreds of projects that I've done.