Jump to content

SNRinglstetter

Members
  • Posts

    1
  • Joined

  • Last visited

Everything posted by SNRinglstetter

  1. Hello, I currently try to evaluate the time required for multiple calculations in PVsyst, especially in Batch mode and I'm wondering which is the limiting step in the simulation process. So in detail, I would like to know: How many times does PVsyst have to access the batch file and the meteofile during a batch simulation? Does it have to repeat the access procedure to the batch file for every simulation variant specified in the batch file? And with regard to the import of meteo data, is the meteo file accessed for every hour? Or only "once" per simulation variant? Or does PVsyst import the data in advance to the batch simulation and can use it for all variants? Thank you very much for a soon response.
×
×
  • Create New...