  1. Hello! I really need my people. I'm stuck in my project due to this one single problem. So, I need to simulate a 4047m2 area PV plant with a PV nominal tototal of 85.7kw DC. However when I try to design this in the systems design, the lowest kw I can manage with the total area is around 600kw. I have tried various models of module's, inverters etc but nothing is working. Kindly help.
  2. Okay! I know this question is stupid, but is there any way we can get the answer in Megawatts? Let me give you an example. I want to simulate a 1 acre land and get an output of 131 kilowatts. I will adjust my shading and other parameters etc in such a way that I get this output. However PVsyst gives me an answer in kilowatt HOURS and I want the answer in Kilowatts. How do i do that?
  3. I did not quite understand. If somebody could clear the following queries it would be really helpful: 1) Is pitch in any way related to packing factor? If so, in what way? 2) I know that I want to design a 4057m2 area PV farm. My company has told me to select PV farm in sheds. In order to cover this area, a dimension of 50*2 (Length * Width) is chosen and hence that comes to 45 sheds. My only question is, what value of pitch should be taken to get maximum o/p. My company ideally wants it to be <2m but then the shading factor is almost 0.7 which is very high. So, if anybody could help me with this, it would be highly helpful.
  4. Hey guys, Since I am new to PVsyst I am having a few discrepancies. I want to simulate a 1 acre PV grid connected model. I know the solar module type, inverter config, tilt angle etc. However when it comes to shading I am having problems. I chose the option of No-shading and then went to construction/perspective. Out there I chose Pv in sheds. My question: What pitch value I choose to get maximum o/p efficiency and o/p kWh? For 1 acre? Please help. Thank you.
×
×