Dear PVSYST Support,
I have a question about the grid limitation in PVSYST. Indeed, in my simulation, I put the grid limitation at 250 kVA this way with AC ohmic loss =3%
And the result is -5.8% of unused energy. It seems very huge and the impact on the productible is very strong.
I did the same simulation with 0% Ohmic loss, and the result of unused energy is -0.1%
How is calculated the Unused energy ? It seems that the more you have ohmic loss, the more you have Unused energy due to grid limitation. It's not logical for me.
Do you have more informations about this please ?
Thanks a lot
Sincerely
Mickaël BLEIN