Is there a way to model on-peak and off-peak production? It seems like the self-consumption section is the best bet, but it doesn't seem like there is a straightforward approach.
Hey,
I am seeing this error after I constructed my 3D scene:
I am not sure how to address this issue since I manually defined the pitch for each array. I can still run the simulation, but I am curious about how to resolve this issue.
I don't think this method will work out for me because I am trying to replicate a system that has been built already. Two of the inverters have an odd number of modules, and I am using the 2:1 optimizers. Do you think that this is an issue that will eventually be tackled?