Hello,
I would like to know if it is possible to introduce a real event occurring at one PV site into a simulation, which is the ramp-up limitation of the PPC that only allows a setpoint of 20% of the MEC (maximum export capacity). I.e., because of that, the inverters power output does not follow immediately the growths in irradiation at the same speed.
Would it be possible to introduce any parameter in the simulation that imitate that behaviour to account that losses?
I really appreciate any help you can provide.
Best regards.