Jump to content

TKR

Members
  • Posts

    2
  • Joined

  • Last visited

  1. When running batch simulations on PVsyst, The batch simulation results have a slight overprediction typically 1-20 MWh than the main simulation as per the PVsyst report. All the input parameters are the same for both cases, no parameters are changed but the results are different. This happens regardless of the version of PVsyst I use. What is the cause of this problem/bug and is there a way to fix it? Thank you in advance for any response
×
×
  • Create New...