So incase of a powerplant required to be 50MWac and I know that from the grid code of the country the power factor is 0.9 so should I put inverters equivalent to 50 MVA or equivalent to 50MW/0.9 = 55.5 MVA
I have tried to perform three variants not taking in account AC losses
V0: No power factor
V1: power factor:0.95 lagging
V2: power factor 0.95 Leading
and all three variants have the same energy output and performance ratio