Thanks for the reply.
Still not clear on the concept. From your above reply, PV Syst shows only C10 rating output values in the report. After simulation, we need to calculate for C2, C0.5, or C0.25 rating manually from the C10 output values.
Finally, we need 25MWh discharge daily for 4 hrs. How to set the values PVsyst project with disturbing Battery manufacturer file.
Is our existing setting correct? or need changes, please suggest.