Jump to content

kennyyan

Members
  • Posts

    2
  • Joined

  • Last visited

  1. Hello, Dtarin. You can change your timestamps and import "10 hours" of data, and then change the timestamps after simulation to minutes. If I understand this correctly, this means after simulation result is generated, the corresponding power generation data also correspond to the power generation per minute? if i have 15 mins step ambient data for one year, Can i simulate 4 times in pvsyst so that i can get 15 mins production report?
  2. Good day, Same question about the Voc correction. From my project, the modules per string could increase to 29 with Voc correction. But according to the project setting, I set the minimun temperature as the lowest ambient temperature(as from the project,the array temperature is corrected by the Tamb. ), and it turned out to be 28 modules per string. Much appreciate if PVsyst can explain about the Voc corrected by the Tarray and GlobInc. Any information will be really helpful. Thanks! Kenny
×
×
  • Create New...