Hello, Dtarin.
You can change your timestamps and import "10 hours" of data, and then change the timestamps after simulation to minutes.
If I understand this correctly, this means after simulation result is generated, the corresponding power generation data also correspond to the power generation per minute? if i have 15 mins step ambient data for one year, Can i simulate 4 times in pvsyst so that i can get 15 mins production report?