Jump to content

Wenshuo Zhang

Members
  • Posts

    4
  • Joined

  • Last visited

Everything posted by Wenshuo Zhang

  1. Hello, Can we use PVsyst to simulate 2P mounting system? Do we just double "Coll. band width"? Are there more parameters need to be changed? Appreciate if anyone could shed light on. Best regards, Wenshuo
  2. Hi Michele, Thanks for your prompt reply. I'll deselect the self-consumption and manually calculate for our simulation result for now. Best regards, Wenshuo
  3. Hello! I'm simulating a PV system, self-consumption for trackers but no storage. In the PVsyst report, Produced Energy is 257GWh/year but E_Grid is 259GWh/year. If I take out self-consumption, these two numbers will match. Does this look right? From below reference, E_avail. shall also be larger than E_Grid. https://www.pvsyst.com/help/self_consumption.htm Below is from the PVsyst report: Does anyone know the reason? Thanks. Best regards, Wenshuo
×
×
  • Create New...