  1. For even number strings, it's easy enough: Nb. of modules in parallel = 2; Nb. optimizers in series = String length/2

    For odd number strings, what would be the best way to model them in PVsyst? (2 modules per optimizer, with the last optimizer having 1 module)

    I can't add a subarray with Nb. of modules in parallel = 1, and then add the missing modules, as there must be 14 optimizers in series.

     

    More about the system:

    Modules - Hanwha Q.PEAK DUO L-G6.2 430

    Optimizers - SolarEdge P860

    Inverters - SE33.3K-US

     

    Any tips or tricks that have worked for people in the past?