Jump to content

Gaurav

Members
  • Posts

    1
  • Joined

  • Last visited

  1. Gaurav

    Net Metering

    Hi I work on PVsyst version 6.22 (Demo). I need help to execute Net metering option (available in Input parameters). I have chosen fixed constant load option and then allocate value of the order of 850 MWh/ year and further run the simulation. In the PVsyst report , page 3 (last page with loss diagram), it is showing only 431 MWh as value. Furthermore, difference between available energy at inverter output is and Dispatch: user and grid reinjection is only 420. I am not able to figure out this value. I need help on this matter.
×
×
  • Create New...