Hi everybody,
I have to to run a simulation of a grid connected pv plant consisting of three converter units connected in and out with internal LV/MV transformer each (380V/22000V).
Then there is a step up transformer from 22kV to 66kV inside the facility and a 66 kV OHL up to the substation where the POC is located. The OHL is almost 2km long
How can I take into account the losses of the different sections MV and HV?
Regards
Pierluigi
How to take into account of MV and HV losses on different sections
in Simulations
Posted
Hi,
so this means that PVsyst only is able to give a result as if the POC is before the step-up transformer.
To have a realistic production forecast, I should thus calculate the loss in % due to the step up transformer and the OHL and then apply to the PVsyst result.
Do you find it correct?
Regards
Pierluigi