Hi, so this means that PVsyst only is able to give a result as if the POC is before the step-up transformer. To have a realistic production forecast, I should thus calculate the loss in % due to the step up transformer and the OHL and then apply to the PVsyst result. Do you find it correct? Regards Pierluigi