LGlezG Posted 1 hour ago Posted 1 hour ago Hi, I have the following limitations from the grid: Import: capacity: 150 kVA, power factor: 0.95 lag to unity Export: capacity 15,000 kVA, power factor: 0.98 lead How should I introduce this in PVSyst? Should be 15 MVA and PF 0.98 lead or 15MVA and PF 0.95 lag? Thanks.