Age Posted March 12 Posted March 12 (edited) For subsidy conditions/restrictions we have a different grid connection limitation between a fixed tilt and tracking array. currently we either: a) design these arrays in seperate projects, or b) average the grid connection limitation in a pvsyst with both types of array. would it be possible to add more options regarding grid limitations. Perhaps somewhere at the MV stations or something. thanks Edited March 12 by Age title more better
Muhammed Sarikaya Posted March 20 Posted March 20 Dear, Indeed, both of your options provide good results. Thank you for the advice. I will take note of it in our roadmap. Regards,