Age Posted 15 hours ago Posted 15 hours ago (edited) For subsidy conditions/restrictions we have a different grid connection limitation between a fixed tilt and tracking array. currently we either: a) design these arrays in seperate projects, or b) average the grid connection limitation in a pvsyst with both types of array. would it be possible to add more options regarding grid limitations. Perhaps somewhere at the MV stations or something. thanks Edited 15 hours ago by Age title more better
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now