Li-ESS Posted September 2 Posted September 2 Dear all, I want to calculate a normalized value of average array output without loss (EArray) by Pnom [kWp] in the range 0 to 1, expected the results are the same as Ya / 24. But I found the results are not the same. How to calculate it correctly? For example, I ran the aging tool, selected 8 years for simulation and "generate output files" includes the variables "EArray" and "Ya". I copied and pasted the values of "EArray" and "Ya" in one excel, finally expected: for each hour, the SUM(EArray1 + ... + EArray8)/8/Pnom = Ya/24 Thank you in advance!
Li-ESS Posted September 4 Author Posted September 4 Or, the correct method is the 8th year Ya = EArray / Pnom, it doesn't need to use the 8-year average of EArray.
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now