Sophie Posted August 29 Share Posted August 29 Hi, I want to create a load duration curve with PVSyst. A diagram with the annual hours (h) on the x-axis and the cumulated power (kW/MW) on the y-axis. I couldn't find it anywhere among the predefined graphs in PVsyst, nor could I create it myself with the hourly graphs. I hope anyone had the same problem and solved it! Thank you. Link to comment Share on other sites More sharing options...
André Mermoud Posted September 3 Share Posted September 3 Sorry, it is not possible to get such a plot directly from PVsyst. The only way is to create a CSV hourly file during the simulation, including the variable E_Load (or any other desired energy quantity). And then you have to elaborate your plot from these hourly values in EXCEL. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now