Reference Backtracking Parameters


Mkitay123

Recommended Posts

Hi All,

 

I am running a simulation with multiple pitches in the shading scene. The average pitch would be 10.9m (pitches are 9.5m, 10.5m, 11m, 11.5m and 12m) however PVSYST automatically selects 9.5m in the Reference Backtracking Parameters within the shading scene (image below). 

image.png.576b559b51482d79c3a4f3ae2e825d1f.png

 

 

How does PVSYST calculate this average pitch?

 

Link to comment
Share on other sites

It selects the lowest pitch automatically to avoid shadings. You can select any rack you want to change it or manually enter it in. Calculate a weighted average based on the number of tables at each pitch if they are different.

Edited by dtarin
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...