mohaned Posted December 21, 2023 Posted December 21, 2023 I have a project where I was asked to add a geo membrane to improve Albedo. The supplier gave me the Albedo value for the membrane but also gave me the annual degradation values for the material reflectivity. I wanted to run a batch simulation where i change the Albedo with the years but i can't find this option. Is there another way to do it?
André Mermoud Posted January 2 Posted January 2 No sorry. You should perform these simulations explicitly without batch. NB: As the variations will not be very hight, you can just do 2-3 simulations and interpolate for missing years. I put this option on our roadmap.