Konstantina Posted November 5, 2013 Posted November 5, 2013 Dear Andre,I am simulating a 12 MW system, with tracking titled or horizontal N-S axis with axis titled 0° and I design my scene too but the shading factor table takes a really long time around 2 hours. Is that possible?Also I checked again for 12MW, with tracking horizontal axis E-W and again the time of calculation wwas the same. Should I change something in my parameters? My panels face East and the pitching is 1 meter.Thank you in advance.
Konstantina Posted November 5, 2013 Author Posted November 5, 2013 I also got error 92 for the simulation with the tracking titled or horizontal N-S axis , any ideas?
André Mermoud Posted November 5, 2013 Posted November 5, 2013 See our FAQ With my big power plant, the calculation time is prohibitive
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now