Jump to content

Search the Community

Showing results for tags 'storage'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • PVsyst SA Announcements (read only)
    • Latest news
  • FAQ (read only)
    • Installation and use of PVsyst
    • Meteo data
    • PV Components
    • Shadings and tracking
    • Simulations : parameters
    • Simulations : results
    • Standalone and pumping systems
  • Your questions about PVsyst
    • How-to
    • Problems / Bugs
    • Meteo data
    • PV Components
    • Shadings and tracking
    • Simulations
    • Suggestions
  • Your questions about PVsystCLI
    • How-to
    • Problems / Bugs
    • Suggestions

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


About Me

Found 1 result

  1. In PVsyst, is there a set up to charge BESS first and then discharge the energy into the grid at night such as 7 to 11PM? My utility solar project is 600MWdc and 450MWac at POI. We considered the 264MW x 4hours system using Sungrow ST5015UX-4H-US. When I used Peak Shaving mode, it only charged the extra energy over the POI limit, so once I see the result, it shows only 1.5% of energy was stored during a year. Our goal of the design is charging the energy into BESS during a day and then discharging it after 7PM for 4 hours. Can you give me advice? Also please let me know if PVsyst can support DC or AC coupling separately. Thank you.
×
×
  • Create New...