Search the Community
Showing results for tags 'solaredge'.
-
For even number strings, it's easy enough: Nb. of modules in parallel = 2; Nb. optimizers in series = String length/2 For odd number strings, what would be the best way to model them in PVsyst? (2 modules per optimizer, with the last optimizer having 1 module) I can't add a subarray with Nb. of modules in parallel = 1, and then add the missing modules, as there must be 14 optimizers in series. More about the system: Modules - Hanwha Q.PEAK DUO L-G6.2 430 Optimizers - SolarEdge P860 Inverters - SE33.3K-US Any tips or tricks that have worked for people in the past?
-
Hi, How can I oversize string? In SolarEdge Designer it is possible to use more than 10 optimizer if it has at least 2 string, but PVsyst is limiting me only up to 10 optimizer. Anyone know how to fix this? Thank you
- 3 replies
-
- solaredge
- oversizing
-
(and 1 more)
Tagged with: