Hello,
I am facing an issue with a client , where they want to investigate if 30 modules per string is possible , the combination of Huawei 330KTL-H1 and Tongwei 715Wp TWMNF-715WP vs Jinko Solar JKM-710Wp 66HL5-BDV-710N , the project is Mallorca-Spain, using trackers.
Huawei explains that PVsyst relies only on temperature for string length calculation , while Fusion solar combines temp. + Irradiance + Diode effect, and thus allowing 30 Modules per string.
I would like to know if there is a way to override the string length in Pvsyst cause its not allowing me to simulate this scenario.
looking forward to hearing from you
Kind regards
M.A. Sukhtian