Hello,
I noticed a error when using Huawei 30/40/50KTL-M3 with MERC-1100W-P optimizers.
According to the MERC-1100W-P manual, the maximum power of an optimizer string is 20kWc.
In my configuration I have a Huawei 30KTL-M3 with 2 strings of 36 450Wc panels (18kWc per string), which should be accepted by PVSyst but I got this error.
How can I overstep this PNom ratio limit ?
Thank you in advance,
Best regards