Hello,
Can anyone help in selecting the simulation parameters of the PV+BESS team so as to obtain a division of STORED 75%, DIRECT USE 25% on the LOSS DIAGRAM?
PV has a power of about 10 MWp and I cannot select the parameters of storage capacity and charging/discharging power to obtain such a result.
I work on a system that uses the PEAK SHAVING storage strategy