Jump to content

tranterengineering

Members
  • Posts

    3
  • Joined

  • Last visited

Posts posted by tranterengineering

  1. When trying to model SolarEdge Optimizers I am presented with the following error message:

    "Inverter #6: With high Powers, the power difference between different strings should not exceed 2000 W.

    However the string design input does not have unbalanced strings - they are actually both the same size...

    It appears that perhaps the error is coming from not having a second/third string configured against these inverters??

    1610125153_PVSystError.JPG.ab9e5edd09b385a120e9924996260473.JPG

  2. Is it just me or has the user's needs load data import been changed/broken on the new 6.4/6.4.1 versions.

    I cannot import data files in the same format I previously could - and all attempts to follow the help instructions have failed.

    I get the following when I try to import csv data - 8760 rows plus headers, two columns - date and power in kW

     

    PVSyst_Error.JPG.d72e7412246d049b2621d29e524ab7bd.JPG

    PVSyst_Error_2.JPG.1df06f59633baac3cc9954ca27eaad71.JPG

     

    Data file here - https://www.dropbox.com/s/3itoqflcuniq9oz/Mackay_Load%20Profile_1%20year.csv?dl=0

  3. I am trying to install PVsyst 6 on a new computer - and I get "Installation directory must be on a local hard drive"

     

    Capture.JPG.de42247d55879b4c68fb97331725bec0.JPG

    Screenshot

     

    I am running Windows 8.1 x64 on a Core i5 with 14 GB RAM and 256 GB SSD (C: - Windows install) + 320 GB HDD (D: - data). I have had PVsyst installed previously on this computer on a previous Windows install.

    Is this something to do with the SSD (which is new)? - Though I have PVsyst installed fine for ages on my Sony Ultrabook which is Win 8.1 with 128 GB SSD?

×
×
  • Create New...