Hi!
I have to simulate the PR of a utility-scale 1.5 MW plant, and due to some authorization problems, I have some strings composed of 26 modules and others made up of 28 modules, all using the same type of module.
Is it possible to simulate this situation in the same case? I thought that the solution could be the creation of different subfields, but there are some string inverters that have as input both 26 and 28 modules per string.
Thank you,
Simone