  1. Hi all, during my simulation i have found the below factors (Mismatch loss factor & Structure shading factor )with their default values , where i am enable to change them but have no idea how to estimate/calculate them to fit my project accordingly can u help me in that ?
  2. yes i understand ur points but how it varies for same project the only difference between the 2 proposals is the type of inverter (central , string inverters) and all other things are the same
  3. Hi Muhammed , thanks for your collaboration for the second question i see in the attached 3d scene image the table has a horizontal axis N-S but he describe his system as "east west configuration" so i feel a bit confused i asked if he may explain the difference between "horizontal axis N-S" and the "horizontal axis E-W"
  4. hi sir i hope ur r well ,i an new here in PV project i have 2 question to u if u don't mind answering me 1- may u explain to be me how u imported a terrain in 3D scene 2- i thought ur configuration is horizontal axis N-S not E-W why u describe it as E-W can u explain to me the difference
  5. Hi all i have 2 system proposals for same project where i set system unavailability pvsyst default values for both (2%) but at loss diagram of the reports i found different value in each , one report with -1.98% and the other -2.45% How does that happened?
×
×