Jump to content

CORONA VIRUS

Members
  • Posts

    1
  • Joined

  • Last visited

Posts posted by CORONA VIRUS

  1. There is the simulation result of the first year:

    image.thumb.png.56fefbd2dd45f5eaa7f25d19822c7c1f.png

     

    image.thumb.png.9ded821af3b1f4e11915efd674adae2f.png

     

    image.png.23e469a9aad6372e75b67b36e343f3db.png

     

    and the picture above is the simulation result of 11 years.

    As you can see, the result (E_Grid = 69.82 MWh) of the first year in Aging Tool table doesn't match the E_Grid in the first picture (56 MWh), 

    is this a bug?

     

    thanks

×
×
  • Create New...