Bonjour et merci,
Même avec votre commentaire, j'ai mis un peu de temps à trouver. Il faut vraiment connaitre cette option pour l'utiliser!
Il est vrai que dans l'aide, il est écrit "(right-click on the sub-array ComboBoxes)"
-
Hello,
As part of a PV project with an 89 kWp optimizer, I'd like to study the difference in production between a solution with 2x33.3 kW inverters (SE66.6K) versus 3x33.3 kW inverters (which is currently ordered).
But I don't manage to simulate the production with 3x33.3 kW inverters. PVSyst don't let me oversize the installation, but it will be done in reality...So that's important that i get this simulation in order to prove that 2 inverters is better than 3.
I note that I don't have the option of adding an inverter manually in the string configuration, as specified in the help file. Nor limiting the number of strings solutionate the problem:
Thank you for your help,
Sylvain Vitali
Power limiting bug (7.4) ?
in Problems / Bugs
Posted
Hello,
When I activate or deactivate the option to enable power limiting, it doesn't work.
For example, here, I had limited the power to 273 kW and although I deactivated the option, I still have an installation that will not produce more than 273 kW...
Even changing the sytem, and lauching again the simulation, the power limitation still in place, and a green light appear on the energy management box:
When I click on it and go on the power limitation, the box isn't activated... Am I wrong or is PVSyst bug? I've tried to restart and I can't remove the clipping.
In the past week, I add another Issue that wouldn't allow me to use the power limitation...
Thank you for your help.
Sylvain Vitali