Jump to content

fot

Members
  • Posts

    2
  • Joined

  • Last visited

Posts posted by fot

  1. Ηi!!

    I have a problem related to inverters and power sharing.

    In the simulation of this specific park we have:

    1. 10 inverters
    2. 10 MPPT each of them
    3. Either 8 or 9 strings with 20 or 22 modules are connected to each inverter

     

    I tried to handle it through power sharing and configurations, as seen in images 1 and 2.

    However, PV syst does not accept an empty input to the inverter and thus, an error occurs.

     

    How can i handle this situation?

     

    Thanks in advance. 

    1.png

    2.png

×
×
  • Create New...