Ηi!!
 
	I have a problem related to inverters and power sharing. 
 
	In the simulation of this specific park we have:
 
	
		10 inverters 
	
	
		10 MPPT each of them
	
	
		Either 8 or 9 strings with 20 or 22 modules are connected to each inverter 
	
	 
 
	I tried to handle it through power sharing and configurations, as seen in images 1 and 2.
 
	However, PV syst does not accept an empty input to the inverter and thus, an error occurs. 
 
	 
 
	How can i handle this situation?
 
	 
 
	Thanks in advance.